Why you need Fire Protection System?
In line with the country aim to uplift infrastructure developments that have transformed the lives of the Myanmar people, Live Alarm Engineering has the latest high-tech, well-designed and sophisticated fire protection system to help to protect your commercial building by complying international standards. Early detection and fighting is vital. Fires cause loss of property and loss of jobs. The difference between losing and saving your business will likely be decided during the first five minutes of a fire. Your odds of surviving a fire are 100% better if a working fire protection system has been installed. Without qualified protection, not only ineligible for Fire Safety Insurance (local & international), but also lost your properties. That’s why; fire protection system shall be installed in Movie Theatres, Grocery and Convenient Stores, Restaurants, Schools, Malls, Banks, Dorms, Nursing Homes, Hospitals, Libraries, Airport, Sub way stations & tunnels, Power house, Ware house, Factories and more....
What we do?
Design
- ✓ Fire Hazard Class/Level?
- ✓ Budget?
- ✓ Minimum Requirement?
- ✓ Follows CPs, S.S & Project Specifications?
- ✓ Modernistic, Ability & Long life for next 20 years?
- ✓ Interfacing?
- ✓ System update/upgrade?
- ✓ Self alone or Communicate to others (buildings, Fire Brigade/etc...)?
Installation
- ✓ Fire Hazard Class/Level?
- ✓ Budget?
- ✓ Minimum Requirement?
- ✓ Follows CPs, S.S & Project Specifications?
- ✓ Modernistic, Ability & Long life for next 20 years?
- ✓ Interfacing?
- ✓ System update/upgrade?
- ✓ Self alone or Communicate to others (buildings, Fire Brigade/etc...)?
Demolishing
- ✓ Effect to existing system?
- ✓ Follows Project Specifications?
- ✓ Phase by phase or Categorized?
- ✓ Well-trained or Skill-full workers?
- ✓ Method of Statements?
- ✓ Follows Health, Safety & Environment (HSE) and Risk assessments?
Project Documentation
- ✓ Consolidate Installation Program (CIP)?
- ✓ Variation Order (VO) from Tender?
- ✓ Add-in & Additional works (A&A)?
- ✓ Office Documents (progress, schedule, report, PTW, MoS, RA, MoM, DO, etc…)?
- ✓ System Wide Co-ordination (SWC)?
- ✓ Inspection Check Lists?
- i. Installation
- ii. Individual Self-Testing & Commissioning
- iii. Interface/ Integrated Testing & Commissioning
- ✓ Material Submission for approval?
- ✓ Drawings?
- i. Tender Working drawing (Plan)
- ii. Combined System wide Drawing (CSD)
- iii. System Enlargement Drawing (SEM)
- iv. As build Working drawing (Plan)
- ✓ Training & Manual Documents?
- ✓ Operation & Maintenance Documents (O & M)?
- ✓ Defect Liability Period (DLP)?
- ✓ Project Hand-over?
Our Value
System Design
- Our approach to design-and-build customizes system that fit our customers' requirements.
- The cutomer realizes maximum value for project investment as we taken an active role in the pre-construction activities.
AutoCAD
- We matain a team of professionals armed with the latest softwares propelling our drafting with speed and accurancy.
- This ensure that any detail is delivered and completed on schedule and with our customers' budget.
In-house Engineering
- Our in-house resources apply the coustomer's desire to design fire protection system enable a building or system to operate a peak efficiency.
- Our drive to offer creative solutions has earned LIVE ALARM Engineering Group the confidence of our customers in various buildings.
Tie-in project
- The term 'Tie-in' is generally used to described the connection of FPS to Integerated Supervisory Control System of the building.
- These projects are usually required to be completed with a specific time frame without causing inconvenience to the operation schedule.
Organization Chart
S/N | Name | Position | Education |
---|---|---|---|
1 | Zaw Lwin Cho | Project Manager | BE (Mech:) |
2 | Aye Thwin | Project Engineer | - |
3 | Ko Ko Naing | Project Engineer | AGTI (EP) |
4 | Khun Zaw Aung | Project Engineer | BE (Mech:) |
5 | Aung Thu | Welder/Fitter | - |
6 | Aung Ko Ko Oo | Welder/Fitter | - |
7 | Sithu Win | Welder/Fitter | - |
8 | Ye Thiha | Installer | - |
9 | Htwe Htwe Aung | Installer | - |
10 | Zin Phyoe Aung | Installer | - |
11 | Khant Wai Phyoe Thu | Installer | - |
12 | Kyaw Zay Tun | Installer | - |
13 | Zarni Myo Aung | Installer | - |
14 | Myo Min Oo | Installer | - |
15 | Paizay Myo Aung | Installer | - |
Contact
Live Alarm
Engineering
Fire Protection System Solution
0931 222 922
0978 6394 991
info@live-alarm.com
No 342, Thukhamain Street, Ward(20),
Shwe Paukkan Township, Yangon
© 2024 LIVE ALARM ENGINEERING COMPANY LIMITED All Rights Reserved